




VB-FullAir 2C Rear Axle for Mercedes-Benz Sprinter VS30 4x4 Chassis Cab all WBs 2018 to Current
What's included?
- Air springs
- Main springs
- shock absorbers
- Electronic control unit (VB-ASCU)
- Height sensors
- Multi-function remote control
- Can bus interface
- User manual
- Installation by a VB-Airsuspension accredited installing agent
RRP:
*Prices subject to vehicle appraisal
Is VB-FullAir 2C right for you?
- Travel long distances or tour regularly
- Want improved ride comfort and rear axle support
- Experience rear sag or uneven ride height
- Want automatic adjustment to load
- Are looking for a step up from semi-air systems
International
service & support network
355 +
VB installation partners
When you choose Active Technology
Improved stability
Maintains optimal rear ride height, improving balance and control
Greater stability
Improves handling and reduces body roll, especially on winding roads and in crosswinds
Automatic adjustments
Continuously adapts to changing loads without manual input
Peace of mind
Engineered, tested, and supported by VB’s international partner network.
Why choose VB-FullAir 2C?
Unlike auxiliary systems that support existing suspension, VB-FullAir 2C:
- Replaces the rear suspension with air springs
Automatically maintains ride height
Adapts to varying loads
Improves stability and driving comfort
It offers a higher level of comfort and control compared to semi-air systems, without moving to a full 4-corner air setup.
What You Need to Know about VB-FullAir 2C
What is VB-FullAir 2C?
VB-FullAir 2C is a fully automatic air suspension system for the rear axle, replacing the original suspension to improve comfort, stability, and ride height control
How is it different from VB-SemiAir?
VB-FullAir 2C replaces the rear suspension and adjusts automatically, whereas VB-SemiAir supports the existing suspension and requires manual adjustment
Does VB-FullAir 2C level my vehicle?
It maintains optimal rear ride height automatically, but it does not offer full automatic levelling like VB-FullAir 4C systems
Do I need to adjust it manually?
No - the system automatically adjusts to load and driving conditions
Is VB-FullAir 2C right for me over FullAir 4C?
VB-FullAir 2C is ideal if you want improved rear comfort and automatic adjustment. For full vehicle control, height adjustment, and automatic levelling, VB-FullAir 4C may be more suitable
